Friday 20 June 2014

Day 14 - Tiling of Shower Area


Tiling continued today. 

It's slow-moving after the first day, after Ah Huat knew that the plumbers were not coming until Monday.
Tile-cutter

Ah Huat cutting a tile

A floor trap needed to be installed in the shower area.

Previously when we bathed, the water would flow out from a hole in the shower kerb towards the floor trap under the basin near the door. It made the whole bathroom floor wet and I didn't like that. However, this tile-insert floor trap was thicker than the average floor traps, so the floor level was raised. My worry is that the dry area would be raised even higher, 4 inches off the ground to be exact.

 Tiling the kerb for the huge pipes in preparation for the box-up

Because the floor level was raised substantially, Ah Huat ran out of sand for the remaining area. 
He said that the sand would arrive the next day.

The shower screen was installed in the master bedroom bathroom. 

We can't open it to the max though as it would hit the thermostat.


The installer stuck a rubber piece to the shower screen so that when it knocked against the thermostat, the screen would not break, but I found it too ugly and got William to remove it.
Baby said,"Oh my goodness! The doors are so nice!"